|
|
|
|
|||||||||||||||||||||||
Project Features/Highlights
Project Description
The intersection at Glenmore Trail and 18th Street SE is a major entrance and exit link for the communities of Riverbend and Ogden. The intersection also accommodates commercial and industrial traffic along Glenmore Trail which is part of a “Skeletal Road Network” of major transportation routes around the City. Due to the high rate of population and employment growth and significant increases in public and commercial travel over the past five years, upgrading of the intersection increased the efficient functioning of the network system. As a Contractor Partner joined with the owner and engineering consultant for a “Co-operative Project Delivery”, PCL-Maxam provided design assistance and value engineering along with fast track construction. The unit price contract awarded to PCL-Maxam included the earthwork, roads, ramps, bridge, storm drainage, street lighting, landscaping and sound walls. The schedule for the project was aggressive due to the fast track design and construction requirements of the owner. Construction of the detour started
|
Contact
For similar projects contact:OwnerPrime Consultant |
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |