Current Progress
Level 3 concrete structure: 100% Existing toppings removed, waterproofing membrane currently being installed. (60%) Exterior wall construction Wall torch-on: 100% complete Central Atrium: Roof: 100% complete
Wall framing: Started Ceiling layout: Complete (started frame in)
Precast support columns: Complete Precast removal: Complete South Stair: Elevator pit wall, Grade Beams, Slab on Grade: Complete Precast Support Columns: Complete Precast removed: Started Last Tower Crane Removed March 12-14. Project Description
Over the past 36 years, Southgate Centre has been a part of the South Edmonton community. The new construction will add 155,000 square feet on the ground level. There will be two levels of parking directly above the expansion serviced by escalators and elevators descending into the grand atrium area. Inside Southgate Centre, the west side feature court floor is being upgraded with new terrazzo patterns. The marble tile with unique floor patterns will be carried into the expansion. The lighting levels that are currently in the existing Centre will be carried throughout the new construction. Finishing the common areas throughout the entire Centre will be completed with modern and relaxing colours and furniture. The west exterior will incorporate the existing brick with metal cladding and glazing to give the Centre an urban appeal to develop an interesting and attractive streetscape as well as screen the parkade.
|
Contact
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |