| 1 2 3 |
Search Results |
 |
Addition and Renovations, Whistler Hotel
| Location: |
Jasper, AB |
| Description: |
Hotel interior and exterior renovations |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Anthony Henday Drive and Stony Plain Road (100 Avenue) Interchange
| Location: |
Edmonton, AB |
| Description: |
Interchange - road work and bridge |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Anthony Henday Drive Southeast Leg Ring Road
| Location: |
Edmonton, AB |
| Description: |
Ring Road and bridges (P3) |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[P3 (DBFO)] P3 Design Build Finance Operate |
|
|
 |
Bank of Montreal - Mission Hill
| Location: |
St. Albert, AB |
| Description: |
Tenant Fitout |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
Construction Management [CM] |
|
|
 |
Blatchford Field Hangar
| Location: |
Edmonton, AB |
| Description: |
Airport Hangar (Historical Re-creation) |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
BMO Branch - Fort McMurray
| Location: |
Fort McMurray, AB |
| Description: |
Bank of Montreal (Bank - Retail)9,400 sf, two-story building |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMA] Construction Management - Agency |
|
|
 |
Calgary Energy Centre Building
| Location: |
Balzac, AB |
| Description: |
Supply and Erection of Pre-engineered Metal Building Shell. |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Centennial Centre for Interdisciplinary Sciences (CCIS)
| Location: |
Edmonton, AB |
| Description: |
Research and teaching centre - Faculty of Science (University of Alberta) |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
City Centre Redevelopment
| Location: |
Edmonton, AB |
| Description: |
City Centre Redevelopment (Shopping mall renovation) |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Dudley Menzies Bridge - Light Rail Transit Bridge Over The North Saskatchewan River
| Location: |
Edmonton, AB |
| Description: |
LRT Bridge (LRT Bridge over Water) |
| Built By: |
PCL-Maxam, a Joint Venture |
|
|
|
|
 |
Duggan Bridge Rehabilitation
| Location: |
Edmonton, AB |
| Description: |
Bridge Deck Replacement |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Edmonton Access Building Facility Upgrade and Interior Renovations
| Location: |
Edmonton, AB |
| Description: |
Upgrade and interior renovations (Access Edmonton) |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Edmonton Clinic - North (Academic) (Construction)
| Location: |
Edmonton, AB |
| Description: |
Parking lot redevelopment (University of Alberta) |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Edmonton Clinic - South (Clinical)
| Location: |
Edmonton, AB |
| Description: |
Ambulatory care facility (University of Alberta campus) |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Edmonton International Airport Southeast Air Terminal Expansion
| Location: |
Edmonton, AB |
| Description: |
Airport Terminal Building
|
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Edmonton International Airport Terminal Building Expansion
| Location: |
Nisku, AB |
| Description: |
Airport terminal expansion |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Engineering Building, University of Alberta
| Location: |
Edmonton, AB |
| Description: |
Seven-story Building, Six-story Building, Two levels of Underground Parking |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
ETLC Student Common
| Location: |
Edmonton, AB |
| Description: |
Student Common Area (University of Alberta) |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMA] Construction Management - Agency |
|
|
 |
Fire Station #3 / Fire Headquarters
| Location: |
St. Albert, AB |
| Description: |
Fire station and fire department headquarters |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Francis Winspear Centre for Music
| Location: |
Edmonton, AB |
| Description: |
Performing Arts Center
|
| Built By: |
PCL-Maxam, a Joint Venture |
|
|
|
|
| |
| 1 2 3 |