| 1 2 3 4 5 |
Search Results |
 |
14th Street Overpass Sidewalk Rehabilitation
| Location: |
Calgary, AB |
| Description: |
Redevelopment of Existing Bridge Pedestrian Sidewalk |
| Built By: |
PCL-Maxam, a Joint Venture |
|
|
|
|
 |
3rd Street Parkade
| Location: |
Calgary, AB |
| Description: |
Six-level Parking Addition |
| Built By: |
PCL-Maxam, a Joint Venture |
|
|
|
|
 |
4th Avenue +15 Bridge Fifth Avenue Place
| Location: |
Calgary, AB |
| Description: |
Plus 15 bridge over 4th Avenue. |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
7th Avenue Refurbishment, Phase 1 Centre Street - 2nd Street SW Block K Tender
| Location: |
Calgary, AB |
| Description: |
Light rail transportation platform and sidewalk refurbishment. |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
ACC Centre
| Location: |
Calgary, AB |
| Description: |
Tenant Improvement
|
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Acheson Grain Elevator
| Location: |
Edmonton, AB |
| Description: |
New Design-Build Grain Handling Facility |
| Built By: |
PCL Ibberson |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
Alberta Court of Appeal Office Redevelopment
| Location: |
Calgary, AB |
| Description: |
Court Rooms and Judicial Offices in TransCanada Tower |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Banff Centre Banquet Hall Addition
| Location: |
Banff, AB |
| Description: |
Banquet Hall Addition
|
| Built By: |
PCL-Maxam, a Joint Venture |
|
|
|
|
 |
Banff Springs Hotel Health Spa Facility Addition
| Location: |
Banff, AB |
| Description: |
Hotel Addition and Renovation |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Banff Springs Hotel Redevelopment
| Location: |
Banff, AB |
| Description: |
Historic Hotel Redevelopment |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Bankers Hall Galleria
| Location: |
Calgary, AB |
| Description: |
10 eight-story tree structures |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Bankers Hall West Tower
| Location: |
Calgary, AB |
| Description: |
52-storey twin tower with parkade expansion. |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Bethany Harvest Hills Alzheimers Facility
| Location: |
Calgary, AB |
| Description: |
Long-term Care Facility |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Bison Courtyard
| Location: |
Banff, AB |
| Description: |
Commercial/residential environmentally sustainable development. |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
CAA - Trans Border Baggage and Duty Free Store
| Location: |
Calgary, AB |
| Description: |
This project involves an up-grade of the re-check baggage systems. |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Calgary Airport Authority - Concourse B/C Modifications
| Location: |
Calgary, AB |
| Description: |
Airport renovations |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Calgary Place Renovations 2004
| Location: |
Calgary, AB |
| Description: |
Calgary Place Renovations |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Calgary Tower Observation Deck
| Location: |
Calgary, AB |
| Description: |
Extend viewing platform |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[CMA] Construction Management - Agency |
|
|
 |
Calgary Zoo - Tropical Asia (Elephant Crossing)
| Location: |
Calgary, AB |
| Description: |
Replace the existing large mammal house and yard with new. |
| Built By: |
PCL Construction Management Inc. |
| Delivery Method: |
[CMR] Construction Management - At Risk |
|
|
 |
Canada Trust Tower/Calgary Eaton Centre, Phase 2
| Location: |
Calgary, AB |
| Description: |
40-Storey Office Tower on a 4-Story Retail Podium |
| Built By: |
PCL-Maxam, a Joint Venture |
| Delivery Method: |
[TB] Traditional Bid |
|
|
| |
| 1 2 3 4 5 |